Kartal Web Design: Project Steps, Speed Targets, and Accessibility Criteria
A business in Kartal that commissions a website can expect clear steps from the discovery meeting to launch. The site's performance is also checked against Google's speed targets and WCAG accessibility criteria.
Nurullah Okatan · Content Writer
· Updated: · 15 min read

A business in Kartal starts a web project with a discovery meeting first; then scope, timeline and quote are clarified, and after approval design, development and launch follow. A site's performance is measured by Google's LCP and INP speed values, by WCAG accessibility criteria, and by regular maintenance after launch.
The benefits of doing web design with a local team in Kartal
Meetings for a project run with a team in Kartal can take place in the same district. This shortens approval rounds. Türk Bilişim's office is in Karlıktepe Neighborhood, Manzara Adalar B Block. A business design draft in Kartal, Pendik or Maltepe can be reviewed together on screen. The menu structure and photo selection can be decided at the same table.

In a face-to-face meeting, the business owner can directly show their product, shop or production area. This information reaches the website's texts and visuals faster than email exchanges. Which page is prepared first is also decided in the same meeting.
Türk Bilişim, described as Turkey's best Mobile UI/UX Design & Prototype firm, has worked as a digital agency since 1998. It has carried its current name since 2007. The team handles website, e-commerce, mobile app and system infrastructure work under one roof. For this reason, there is no need to look for a second provider for hosting, an SSL certificate or an integration added later.
Projects can be run in Turkish, English, Arabic and Russian. A Kartal company selling abroad may ask for a separate page structure for each language during initial planning. The scope of corporate websites is described in detail on the corporate website service page.
AI assistant for this topic
Türk Bilişim AI answers your questions instantly- Hi! Ask whatever you're curious about.
What steps does a web design project follow?
A project starts with a short discovery meeting. In this meeting, the business's needs and the result it expects from the site become clear. Coming to the meeting prepared speeds up the next steps.
It helps to have the following information ready for the first meeting:
- The site's purpose: phone calls, form submissions, online sales or promotion
- Existing domain name, hosting information and access to the old site, if any
- Logo, corporate colors and photos at hand
- A few sample sites you like and the reason you like them
- The languages in which the site will be published
Scope, timeline and quote are shared after the discovery meeting. Number of pages, language options and the integrations required are put in writing at this stage. Design begins with the business's approval.
| Stage | What is done | What is expected from the business |
|---|---|---|
| Discovery meeting | Needs and goals are defined | Purpose, sample sites, existing access |
| Scope, timeline, quote | Page list, number of languages and delivery plan are written | Reading and approving the scope |
| Design | Drafts of the home page and inner pages are prepared | Feedback on the drafts |
| Development | Pages are coded and content is placed | Delivery of text and visuals |
| Launch | The site goes live after speed and accessibility checks | Final check and launch approval |
| Maintenance | Updates and support continue | Conveying change requests |
For those who want to learn in advance which decisions are made during the design stage, there is an article on what web design covers.
Looking for API Development & Integration?Google's speed targets, LCP and INP values
Whether a page loads fast enough is understood through the LCP (Largest Contentful Paint) value. According to Google's Core Web Vitals guide, LCP should occur within the first 2.5 seconds after the page starts loading. LCP measures when the largest image or text block on the screen becomes visible. On a restaurant's site in Kartal, this element is often the large photo on the home page.
The second speed measure is the INP (Interaction to Next Paint) value. The same Google guide recommends keeping INP below 200 milliseconds. INP shows how quickly the page responds when a visitor presses a button or opens a menu. Heavy scripts and too many plugins raise this value.
FID (First Input Delay) is no longer used. According to the source corewebvitals.io, INP replaced FID in March 2024. FID measured only the delay of the first interaction. INP looks at the response time of interactions across the page. A business that sees FID in old reports should ask for the INP value for current measurement.
To lower the LCP and INP values of an existing site, images are compressed, unused code is cleaned up and server response time is shortened. The scope of this work is covered on the performance, security and SEO service page.
WCAG criteria for accessibility
WCAG (Web Content Accessibility Guidelines) rests on four principles: perceivable, operable, understandable and robust. According to the Wikipedia article on WCAG, WCAG 2.0 consists of twelve guidelines under these four principles. The guidelines contain 61 testable success criteria in total. According to the same source, WCAG 2.1 became a W3C Recommendation in June 2018.

The principles find concrete counterparts in daily use. A visually impaired visitor learns what a photo shows from the alternative text through a screen reader. Someone who cannot use a mouse must be able to fill in a form using only the keyboard.
Accessibility testing is done in a few steps:
- The site is navigated from start to finish with the Tab key; it is checked whether every link and button can be reached.
- The color contrast between text and background is measured.
- The alternative text of images and the labels of form fields are checked.
- The page is listened to with a screen reader; it is followed whether the heading order is logical.
Automated tools catch some of the gaps. Keyboard and screen reader testing is done by hand. Other articles on design and development are gathered in the Web Design & Development category.
What do maintenance and updates cover after launch?
After the site is delivered, updates are handled either by the team that built the project or by the business itself. This decision should be written into the contract. Türk Bilişim provides maintenance, updates and support after publication. This way, the team that built the site also keeps track of software updates.
A maintenance contract that clearly states the following points prevents disputes that may arise later:
- Who will carry out software and plugin updates, and how often
- Where backups will be kept and how they can be restored
- How quickly a response will be given to a fault
- Whether content changes fall within the scope of maintenance
- Who is responsible for renewing the SSL certificate and domain name
Other questions about the way of working are answered on the frequently asked questions page.
Looking for Publishing & ASO?Frequently asked questions
Can an existing site be made faster without redesigning it from scratch?
In most cases, yes. Image sizes are reduced, unnecessary plugins are removed and caching is configured. LCP and INP are then measured again.
Can a website be prepared in more than one language?
Yes, projects can be carried out in Turkish, English, Arabic and Russian. Since Arabic pages are read from right to left, the menu and alignment are arranged separately.
Can the business update its content itself after publication?
On sites with a content management panel, text, photos and announcements can be changed by the business. The use of the panel is demonstrated at handover. Software updates, however, remain with the team under the maintenance scope.
What should be prepared for the first meeting for a website project?
A logo file, the details of the company where the current domain name is registered, and the addresses of two or three sites you like are a sufficient starting point. A list of points missing from competitor sites also helps to clarify the scope.
Türk Bilişim · Free Quote
Get a free quote for your Android App Development project
Leave your number and we will get back to you right away. The call is free.
Your request is saved on this device
We can't reach our server right now. Your request will be sent automatically once the connection is back. To talk right away:

Share this article
Comments
Comments
No comments yet.
















