Online Appointment and Customer Management for Elevator Companies
When elevator companies gather maintenance schedules, breakdown calls, and building manager records in a single digital system, the number of missed maintenance visits and forgotten contracts drops. This article explains the components of such a system and the setup steps.
Nurullah Okatan · Content Writer
· Updated: · 14 min read

An elevator company records monthly maintenance, annual periodic inspections, and breakdown calls as separate work types in a single record system. The system lists devices due for maintenance, sends a work order to the technician, closes the service form with a digital signature, and keeps the building manager's contract information on the same customer card.
What does appointment and customer recording cover in an elevator company?
In an elevator company, appointment recording covers three distinct types of work: monthly maintenance, annual periodic inspection, and breakdown calls. Each has a different schedule, urgency, and responsible person, which is why they are opened as separate record types in the system.

Monthly maintenance is tied to a contract and repeats on the same cycle every month. Annual periodic inspection is scheduled according to the date the inspection body visits the building, and a label is issued as a result. Breakdown calls are unplanned; the moment a record is opened, it takes priority. According to Servios data, in elevator maintenance modules these three jobs are monitored on one screen together with label tracking and the Elevator Maintenance Form.
The basic unit in customer records is the building. Under the building card are the manager's name and phone number. The same card also holds a separate device record for each elevator in the building and its valid maintenance contract. When the manager changes, only the contact information is updated; the device history and contract remain in place.
When planning inspection day, the engineer's daily capacity is taken into account. According to the periodic inspection regulation as conveyed by AYSAD, an inspection engineer can perform follow-up inspections on at most twelve elevators in a full day. Grouping buildings in the same neighborhood on the same day uses this quota efficiently. The availability of the maintenance technician at the building on inspection day is also added to the appointment as a note. In addition, who holds the machine room key is recorded.
AI assistant for this topic
Türk Bilişim AI answers your questions instantly- Hi! Ask whatever you're curious about.
How do maintenance scheduling and periodic inspection tracking work in a digital system?
In a digital maintenance schedule, the system adds the contract interval to each device's last maintenance date. It therefore calculates the next maintenance day itself. The office team does not keep a schedule; it only approves the list.
According to Servios data, the periodic maintenance module lists devices whose maintenance time has come. Those that are overdue are also flagged separately on the dashboard. Selected devices are converted into service records in bulk. At the start of the month, the maintenance of fifty buildings is not opened one by one; it is distributed to technicians in a few clicks.
At the end of service, a tablet or phone is used instead of a paper form. According to the same source, when the technician completes the job, the technician obtains a digital signature from the customer and the service form is generated as a PDF. The form is sent to the building manager by email, and a copy is added to the device history. There is no need to scan and file the form in the office.
For building residents, the most practical method is the QR label. According to Servios data, a QR label attached to the device lets the customer see the maintenance history from their own phone. A resident who scans the label inside the cabin learns when the last maintenance was done, without needing to call the manager.
| Task | When run on paper | In the digital system |
|---|---|---|
| Device due for maintenance | Checked manually from a notebook or Excel | List is generated automatically |
| Overdue maintenance | Usually noticed only when a complaint arrives | Appears as a warning on the dashboard |
| Service form | Wet signature, then filed in the office | Digital signature, PDF form |
| Maintenance history | In a card in the machine room | Via phone using a QR label |
Where ready-made modules are not sufficient, company-specific tracking screens can be developed. Examples are given in articles on custom software development.
Looking for Android App Development?Handling breakdown calls and appointment requests outside business hours
A breakdown call that arrives at night is recorded directly through a phone-answering assistant or a web form. The on-duty technician sees the notification on their phone. When the office opens in the morning, the call is listed with its time, so no call is lost.
If someone is trapped in the cabin, the call takes a different route. The assistant asks this question first. If the answer is yes, the call is transferred to the on-duty technician's phone. If no one is trapped, a breakdown record is opened and scheduled as the first task in the morning.
The information the voice assistant asks the caller is enough for the technician to go to the site prepared:
- The name or address of the building; the system matches it with the building card.
- If there are several elevators in the building, which one is faulty.
- Whether anyone is trapped in the cabin.
- A brief description of the fault: door does not close, does not stop at a floor, makes a noise, etc.
- The caller's name and a callback number.
Requests other than breakdowns are also handled on the same line. When a building manager calls at night, they may ask for a pre-inspection check or a contract meeting. The assistant places this request in an open slot in the schedule and sends a confirmation message.
Türk Bilişim, Turkey's best AI Chatbot and Customer Assistant company, has been developing artificial intelligence solutions since 2022. The company's AI voice assistant and call bot service sets up this question flow by connecting it to the company's own building list.
Building manager and maintenance contract tracking with CRM
The contract renewal date is kept as a field in the CRM. The system generates a reminder a set period before this date. The reminder both becomes a task for the office team and sends a renewal email to the building manager. For sites where the management board has changed, the new manager's contact information is updated in advance so that the email reaches the right person.

Keeping an existing building under contract is cheaper than finding a new one. According to a Harvard Business Review study cited by Turkcell Blog, the cost of retaining a customer is roughly one fifth of the cost of acquiring a new one. According to Cubicl data, companies that apply an effective customer relationship strategy can raise their customer retention rate by up to 27%. For an elevator company, this means fewer buildings lost during renewal periods.
Buildings at the proposal stage are also tracked in the same system. According to the Salesforce 2025 State of Sales report, relayed by Turkcell Blog, companies using CRM shorten their sales cycles by 29% on average. Discovery, proposal and contract steps appear as stages in the CRM. This way it becomes clear which proposal is waiting.
Administrative workload is the item that takes up the most of the team's time. According to the Forrester 2023 study, also relayed by the same source, an average sales representative devotes 65% of their working time to administrative tasks. For an elevator company, this usually means filling in forms, calling the manager to report maintenance dates, and tracking invoices. CRM converts most of these steps into automatic emails and tasks.
Maintenance notifications, renewal reminders and post-service satisfaction emails can be set up as ready-made workflows. Email and CRM automation links these workflows to the dates on the building card.
Steps for setting up an online appointment system for an elevator company
The choice depends on the company's existing systems. If an accounting program, stock tracking and a website are already in use, the appointment system should connect with them. If there is no system at all, starting with a ready-made service software is quick.
| Criterion | Ready-made software | Custom solution integrated with existing systems |
|---|---|---|
| Deployment | Account is opened and use begins | Analysis and development time is required |
| Accounting and stock connection | Limited to the connections the software offers | Set up according to the program the company uses |
| Screen and form structure | Standard templates | Designed according to the company's workflow |
| Cost structure | Monthly or annual subscription | Project fee and maintenance support |
Setup proceeds in the following order:
- Building, device and contract lists are gathered in a single file.
- Maintenance intervals and inspection dates are entered on device cards.
- Technicians are defined in the system with mobile access.
- QR labels are printed and attached to the cabinets.
- The phone line and web form are connected to the system.
Artificial intelligence is added at the final stage, because it requires well-maintained building and device records. According to the market.us 2024 report, relayed by Turkcell Blog, 61% of businesses plan to integrate artificial intelligence into their CRM systems within three years. Türk Bilişim also provides maintenance, updates and support after publication. Similar applications are described in articles on artificial intelligence and automation.
Looking for AI Voice Assistant & Call Bot?Frequently asked questions
Does an online appointment system require a separate application for building managers?
No. The manager submits the request through a form opened in a browser or by phone; the approval and service form arrive by email.
Can the existing customer list be transferred from Excel to the new system?
Yes. The transfer goes smoothly if building, device and contract information is kept in separate columns. Different spellings of the same building should be merged before the transfer.
Does maintenance history with QR labels require an internet connection?
Yes, the phone scanning the code must be connected to the internet. The QR code opens a page showing the device's current maintenance record. Placing the label inside the cabinet, such as in the machine room where there is no signal, makes the job easier.
Can the system plan the daily route of several technicians?
This depends on the software used. Some ready-made software offers this as a module. In a custom solution, the route can be designed according to building addresses and fault priority.
Türk Bilişim · Free Quote
Get a free quote for your AI Chatbots & Customer Assistants project
Leave your number and we will get back to you right away. The call is free.
Your request is saved on this device
We can't reach our server right now. Your request will be sent automatically once the connection is back. To talk right away:

Share this article
Comments
Comments
No comments yet.
















